Cramlington Biomass CHP Plant – Fisher Lane
- Thermal input 78 MWth
- Net power output:
- 26 MWe.
- 6 MWth
- Fuel reception, storing and feed
- Boiler
- Steam turbine and generator
- Condensing and cooling
- Flue gas treatment
- Water treatment plant
- 11 kW electrical power and steam
E&IM has been appointed by Redecam Group to supervise the Flue gas treatment section construction.

